Page 4 of 9
Part 4: April and May 2001
As planned, the culvert under the standard gauge coal line was installed on 25–26 April, and the coal line re-opened for traffic on 27 April.



As planned, the culvert under the standard gauge coal line was installed on 25–26 April, and the coal line re-opened for traffic on 27 April.