Final fitting and testing of NM25 during March and April 2003.
Delivery to Port Augusta
Delivery to Port Augusta
The engine unit of NM25 travelling over the narrow gauge line (left) on delivery to PRR at the Port Augusta turntable on 1 March 2003
At Quorn loco depot
At Quorn loco depot
NM25 standing at the loco depot shortly after arriving in Quorn.
"Pink steam day"
"Pink steam day"
"Pink steam day" is usually the first steaming of the locomotive, and involves opening the throttle with the cylinder covers off to blow out rust and other rubbish from the steam lines.In NM25's case, Pink Steam Day was 10 April 2003 at Quorn Locomotive Depot.
Moving for the first time
Moving for the first time
11 April 2003, NM25 eases out of the loco shed for the first time under its own power for nearly 38 years.
First test run
First test run
The first test run of NM25 was from the depot to Quorn station and return on 11 April 2003.A grand total of little over 1 mile, the test nonetheless proved that most basic funtions were satisfactory, and a few niggling leaks needed resolving.
NM25 on Woolshed Flat bridge during trials
NM25 on Woolshed Flat bridge during trials
A photograph of NM25 running "light engine" during trials.
In the cab
In the cab
Cab controls
Cab controls
NM25 at Quorn Loco water column
NM25 at Quorn Loco water column
 